Triple

T2904060
Position Surface form Disambiguated ID Type / Status
Subject Plan of Manila E62721 entity
Predicate instanceOf P0 FINISHED
Object city beautification scheme C6939 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: city beautification scheme
Context triple: [Plan of Manila, instanceOf, city beautification scheme]
  • A. urban design project chosen
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • B. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • C. cityscape painting
    A cityscape painting is an artistic depiction of an urban environment, focusing on buildings, streets, and city life to capture the atmosphere and character of a city.
  • D. urban public space
    An urban public space is a publicly accessible area within a city—such as streets, parks, plazas, and squares—designed or used for social interaction, movement, recreation, and civic life.
  • E. city
    A city is a densely populated, structured urban area characterized by extensive infrastructure, diverse economic activities, and complex social, cultural, and political systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4c3e070c8190b78d3d2c005876dd completed March 6, 2026, 9:50 p.m.
Created at: March 6, 2026, 10:11 p.m.