Triple

T28993574
Position Surface form Disambiguated ID Type / Status
Subject Zhuhai railway station E736094 entity
Predicate isTerminusType P9111 FINISHED
Object southern terminus LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: southern terminus | Statement: [Zhuhai railway station, isTerminusType, southern terminus]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isTerminusType
Context triple: [Zhuhai railway station, isTerminusType, southern terminus]
  • A. isTerminal
    Indicates that an entity represents an endpoint or final state in a process, structure, or sequence, with no further continuation beyond it.
  • B. terminusType chosen
    Indicates the specific kind or role of an endpoint or terminal within a route, network, or process.
  • C. isTerminalIn
    Indicates that one entity functions as a terminal (end point or final element) within another entity, such as a structure, sequence, or process.
  • D. isTerminusAccessFor
    Indicates that one location or facility serves as an access point or terminal endpoint for another transportation route, service, or system.
  • E. hasTerminusIn
    Indicates that something (such as a route, line, or path) ends or has its final stopping point at a specified location.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f077eacd0481908ef0bafd74491cd0 completed April 28, 2026, 9:03 a.m.
NER Named-entity recognition batch_69f65f7f067081909057e9c6e1fd0bdd completed May 2, 2026, 8:33 p.m.
PD Predicate disambiguation batch_69f659d02f1c8190831758ac52bb54e4 completed May 2, 2026, 8:08 p.m.
Created at: April 28, 2026, 9:28 a.m.