Triple

T28972099
Position Surface form Disambiguated ID Type / Status
Subject Lorraine prototype chipset E734300 entity
Predicate instanceOf P0 FINISHED
Object prototype hardware design C23 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: prototype hardware design
Context triple: [Lorraine prototype chipset, instanceOf, prototype hardware design]
  • A. open hardware project
    An open hardware project is a collaborative initiative to design, document, and share physical devices whose schematics, source files, and build instructions are publicly available for anyone to study, modify, and reproduce.
  • B. prototype tank
    A prototype tank is an experimental armored combat vehicle built to test and refine new technologies, designs, and capabilities before mass production and frontline deployment.
  • C. virtual development board
    A virtual development board is a software-based simulation of a physical hardware development platform that allows developers to design, program, and test embedded systems without needing the actual device.
  • D. research prototype chosen
    A research prototype is an early, often experimental implementation of a concept or system created to explore feasibility, validate ideas, and gather feedback before full-scale development.
  • E. open hardware ecosystem
    An open hardware ecosystem is a collaborative environment in which hardware designs, tools, and documentation are freely shared, modified, and redistributed by a community to accelerate innovation and reduce barriers to physical technology development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b0d1e7c819092baab93d3fe277e completed April 28, 2026, 7 a.m.
Created at: April 28, 2026, 9:06 a.m.