Triple
T28949527
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | City of Vancouver from the North Shore |
E730969
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | scenic viewpoint subject |
C3945
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: scenic viewpoint subject Context triple: [City of Vancouver from the North Shore, instanceOf, scenic viewpoint subject]
-
A.
scenic overlook
A scenic overlook is a designated elevated or open area, often along a roadway or trail, that provides visitors with a safe, unobstructed vantage point for viewing and appreciating a notable landscape or vista.
-
B.
landscape
A landscape is an extensive outdoor scene encompassing the visible features of an area of land, including its natural elements, human-made structures, and environmental conditions as perceived from a particular viewpoint.
-
C.
scenic district
A scenic district is a designated geographic area recognized and protected for its outstanding natural beauty, cultural landscapes, and visual character, often managed to preserve its aesthetic and environmental qualities.
-
D.
cherry-blossom viewing area
A cherry-blossom viewing area is a designated outdoor space optimized for appreciating cherry trees in bloom, often featuring seating, pathways, and scenic vantage points.
-
E.
viewpoint
chosen
A viewpoint is a particular perspective or angle from which something is observed, considered, or interpreted.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f043eb9bcc819091ac7b07aecb6475 |
completed | April 28, 2026, 5:21 a.m. |
Created at: April 28, 2026, 8:42 a.m.