Triple

T28948699
Position Surface form Disambiguated ID Type / Status
Subject Red River Floodway E730947 entity
Predicate expansionCompletedIn P60942 FINISHED
Object 2010 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2010 | Statement: [Red River Floodway, expansionCompletedIn, 2010]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: expansionCompletedIn
Context triple: [Red River Floodway, expansionCompletedIn, 2010]
  • A. laterExpansionCompletion
    Indicates that the completion of an expansion occurs at a later time than another referenced event or expansion.
  • B. expansionStatus
    Indicates the current state or phase of growth, enlargement, or extension of something relative to its previous or intended size or scope.
  • C. completionOf
    Indicates that one entity represents the finished state, fulfillment, or successful conclusion of another entity, process, or requirement.
  • D. expansionCompletion chosen
    Indicates that a previously initiated expansion process or enlargement of something has been fully completed.
  • E. wasExpandedIn
    Indicates that something increased in size, scope, or extent during a specified time or event.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f043eb9bcc819091ac7b07aecb6475 completed April 28, 2026, 5:21 a.m.
NER Named-entity recognition batch_69f6aaf50be08190a2b62a6d881f8aee completed May 3, 2026, 1:55 a.m.
PD Predicate disambiguation batch_69f6aa1c555081908787dbf76147f180 completed May 3, 2026, 1:51 a.m.
Created at: April 28, 2026, 8:42 a.m.