Triple

T28943841
Position Surface form Disambiguated ID Type / Status
Subject O3 E730525 entity
Predicate precededByCommissioning P25144 FINISHED
Object Advanced LIGO and Advanced Virgo upgrades NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Advanced LIGO and Advanced Virgo upgrades | Statement: [O3, precededByCommissioning, Advanced LIGO and Advanced Virgo upgrades]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: precededByCommissioning
Context triple: [O3, precededByCommissioning, Advanced LIGO and Advanced Virgo upgrades]
  • A. commissioningUpon
    Indicates that one entity formally authorizes, initiates, or assigns another entity to begin a specific role, task, or project.
  • B. commissionedAfter
    Indicates that one entity was formally authorized, ordered, or initiated at a later time than another entity.
  • C. expectedCommissioning
    Indicates that an entity is anticipated or scheduled to be formally put into operation or service.
  • D. wasPrecededBy chosen
    Indicates that one event, state, or entity occurred or existed earlier in time than another.
  • E. commissionedPhase
    Indicates that an entity has formally initiated or authorized a particular phase or stage of a project, process, or work.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f043ea0aa88190a25acbf46157995a completed April 28, 2026, 5:21 a.m.
NER Named-entity recognition batch_69f7117e55908190a67105e92bc4830f completed May 3, 2026, 9:12 a.m.
PD Predicate disambiguation batch_69f70f380690819090cc34763ba460ed completed May 3, 2026, 9:02 a.m.
Created at: April 28, 2026, 8:38 a.m.