Triple
T28934344
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Insular Belt |
E733872
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | plutonic terrane |
C7401
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: plutonic terrane Context triple: [Insular Belt, instanceOf, plutonic terrane]
-
A.
plutonic complex
A plutonic complex is a large, composite body of intrusive igneous rocks formed at depth, typically consisting of multiple, related plutonic intrusions emplaced over an extended geological period.
-
B.
geological terrane
chosen
A geological terrane is a distinct block of the Earth's crust with a unique geological history and characteristics that has been tectonically transported and attached to a larger landmass.
-
C.
plutonic rock
A plutonic rock is a coarse-grained igneous rock that crystallizes slowly from magma deep within the Earth's crust.
-
D.
tectonic province
A tectonic province is a large region of the Earth's crust characterized by a distinct and relatively uniform structural style, geologic history, and tectonic setting.
-
E.
tectonomagmatic province
A tectonomagmatic province is a region of the Earth's crust characterized by a distinctive association of tectonic structures and magmatic activity that share a common geologic origin and evolutionary history.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f05b0b49b08190b8994b339c7980f6 |
completed | April 28, 2026, 7 a.m. |
Created at: April 28, 2026, 8:30 a.m.