Triple
T2892397
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Casbah of Algiers |
E63857
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fortified quarter |
C10812
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fortified quarter Context triple: [Casbah of Algiers, instanceOf, fortified quarter]
-
A.
fortified building
A fortified building is a heavily constructed structure designed with defensive features such as thick walls, limited entry points, and protective battlements to resist attacks and provide security for its occupants.
-
B.
fortified tower
A fortified tower is a tall, strongly built defensive structure designed to provide elevated surveillance, protection, and control over the surrounding area.
-
C.
masonry fort
A masonry fort is a fortified structure built primarily from stone or brick, designed to provide durable defensive protection against attacks.
-
D.
hill fort
A hill fort is a fortified settlement built on elevated ground, typically featuring defensive earthworks, walls, and ditches to control and protect the surrounding area.
-
E.
line of fortifications
A line of fortifications is a connected series of defensive structures, such as walls, trenches, and strongpoints, designed to protect a territory or position by forming a continuous or coordinated barrier against attack.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4c45822c8190830c5f2bb97bcfd0 |
completed | March 6, 2026, 9:51 p.m. |
Created at: March 6, 2026, 10:07 p.m.