Triple

T28906857
Position Surface form Disambiguated ID Type / Status
Subject China Torch Program high-tech zones E733106 entity
Predicate instanceOf P0 FINISHED
Object high-technology industrial development zone network C5755 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-technology industrial development zone network
Context triple: [China Torch Program high-tech zones, instanceOf, high-technology industrial development zone network]
  • A. economic and technological development zone chosen
    An economic and technological development zone is a designated area where governments concentrate infrastructure, incentives, and regulatory support to attract investment, foster industrial innovation, and accelerate regional economic growth.
  • B. infrastructure development zone
    An infrastructure development zone is a designated geographic area prioritized for the planning, investment, and construction of essential public facilities and services—such as transportation, utilities, and communications—to support economic growth and urban or regional development.
  • C. regional economic zone
    A regional economic zone is a geographically defined area within or across countries where economic policies, regulations, and incentives are coordinated to promote trade, investment, and development.
  • D. industrial belt
    An industrial belt is a continuous loop of flexible material used in machinery to transmit power, motion, or materials between rotating components in manufacturing and processing environments.
  • E. commercial and industrial complex
    A commercial and industrial complex is a large, planned development that integrates multiple business, retail, and manufacturing or warehousing facilities within a shared infrastructure and site.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b096d208190958a57d2e4b5a93a completed April 28, 2026, 7 a.m.
Created at: April 28, 2026, 8:07 a.m.