Triple
T28906857
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | China Torch Program high-tech zones |
E733106
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-technology industrial development zone network |
C5755
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-technology industrial development zone network Context triple: [China Torch Program high-tech zones, instanceOf, high-technology industrial development zone network]
-
A.
economic and technological development zone
chosen
An economic and technological development zone is a designated area where governments concentrate infrastructure, incentives, and regulatory support to attract investment, foster industrial innovation, and accelerate regional economic growth.
-
B.
infrastructure development zone
An infrastructure development zone is a designated geographic area prioritized for the planning, investment, and construction of essential public facilities and services—such as transportation, utilities, and communications—to support economic growth and urban or regional development.
-
C.
regional economic zone
A regional economic zone is a geographically defined area within or across countries where economic policies, regulations, and incentives are coordinated to promote trade, investment, and development.
-
D.
industrial belt
An industrial belt is a continuous loop of flexible material used in machinery to transmit power, motion, or materials between rotating components in manufacturing and processing environments.
-
E.
commercial and industrial complex
A commercial and industrial complex is a large, planned development that integrates multiple business, retail, and manufacturing or warehousing facilities within a shared infrastructure and site.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f05b096d208190958a57d2e4b5a93a |
completed | April 28, 2026, 7 a.m. |
Created at: April 28, 2026, 8:07 a.m.