Triple
T28906580
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Juan Gris’s Cubist oeuvre |
E733099
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Cubist art corpus |
C19513
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Cubist art corpus Context triple: [Juan Gris’s Cubist oeuvre, instanceOf, Cubist art corpus]
-
A.
collection of artworks
chosen
A collection of artworks is an organized set of individual art pieces, curated or grouped together based on a unifying theme, origin, creator, period, or purpose.
-
B.
public art collection
A public art collection is a curated assemblage of artworks owned or managed by a public entity and made accessible to the general public in shared spaces or institutions.
-
C.
Op Art series
An Op Art series is a collection of artworks that systematically use geometric forms, precise patterns, and high-contrast colors to create optical illusions of movement, vibration, or spatial depth.
-
D.
art criticism collection
A curated compilation of writings, reviews, and analyses that evaluate, interpret, and contextualize works of art across different periods, styles, and media.
-
E.
art museum project
An art museum project is a coordinated initiative to design, develop, or enhance a museum space and its programs for collecting, exhibiting, and interpreting works of art for public engagement and education.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f05b096d208190958a57d2e4b5a93a |
completed | April 28, 2026, 7 a.m. |
Created at: April 28, 2026, 8:07 a.m.