Triple

T28884475
Position Surface form Disambiguated ID Type / Status
Subject Aqueduct of Maintenon E732515 entity
Predicate constructionHaltedAround P32859 FINISHED
Object 1688 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1688 | Statement: [Aqueduct of Maintenon, constructionHaltedAround, 1688]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionHaltedAround
Context triple: [Aqueduct of Maintenon, constructionHaltedAround, 1688]
  • A. constructionHalted chosen
    Indicates that an ongoing construction activity or project has been stopped or suspended before completion.
  • B. constructionInterruptedBy
    Indicates that an ongoing construction process is halted, delayed, or disrupted due to the actions or occurrence of another specified entity or event.
  • C. cityDuringConstruction
    Indicates that a city exists or is relevant during the time period in which a particular construction activity or project is taking place.
  • D. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • E. constructionResumed
    Indicates that previously halted construction activity on an entity or project has started again.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f05b07bdec819080cadfe147aa1f25 completed April 28, 2026, 7 a.m.
NER Named-entity recognition batch_69f7117e55908190a67105e92bc4830f completed May 3, 2026, 9:12 a.m.
PD Predicate disambiguation batch_69f70f380690819090cc34763ba460ed completed May 3, 2026, 9:02 a.m.
Created at: April 28, 2026, 7:48 a.m.