Triple

T28860278
Position Surface form Disambiguated ID Type / Status
Subject Aquaman: Power Wave E728840 entity
Predicate instanceOf P0 FINISHED
Object launched shuttle coaster C4663 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: launched shuttle coaster
Context triple: [Aquaman: Power Wave, instanceOf, launched shuttle coaster]
  • A. launched roller coaster chosen
    A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
  • B. space shot ride
    A space shot ride is a vertical amusement park attraction that rapidly launches riders upward along a tower using compressed air or similar propulsion, creating intense acceleration and brief weightlessness.
  • C. roller coaster
    A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
  • D. shoot-the-chute ride
    A shoot-the-chute ride is an amusement attraction where a flat-bottomed boat ascends a lift and then plunges down a steep flume into a splash pool, creating a dramatic water spray for riders and spectators.
  • E. Bolliger & Mabillard roller coaster
    A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f031a01cbc8190ba87270bb6fe4639 completed April 28, 2026, 4:03 a.m.
Created at: April 28, 2026, 6:47 a.m.