Triple

T28854897
Position Surface form Disambiguated ID Type / Status
Subject Pearl Harbor Naval Base infrastructure E728708 entity
Predicate instanceOf P0 FINISHED
Object military base infrastructure C1086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military base infrastructure
Context triple: [Pearl Harbor Naval Base infrastructure, instanceOf, military base infrastructure]
  • A. military installation chosen
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • B. military base network
    A military base network is an interconnected system of communication, data, and operational infrastructure linking facilities, units, and resources across one or more military installations to support command, control, logistics, and security functions.
  • C. Marine Corps base
    A Marine Corps base is a military installation that provides facilities, training grounds, housing, and logistical support for United States Marine Corps personnel and operations.
  • D. military-security structure
    A military-security structure is an organized system of forces, institutions, and mechanisms designed to protect a state or entity from external and internal threats through defense, intelligence, and enforcement capabilities.
  • E. military training infrastructure network
    A military training infrastructure network is an integrated system of facilities, ranges, technologies, and support services designed to plan, deliver, and sustain training activities for armed forces across multiple locations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0319f4e5481909e4c439dbe8be940 completed April 28, 2026, 4:03 a.m.
Created at: April 28, 2026, 6:45 a.m.