Triple

T28842349
Position Surface form Disambiguated ID Type / Status
Subject Haifa–Nazareth road E728352 entity
Predicate instanceOf P0 FINISHED
Object intercity road C3122 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: intercity road
Context triple: [Haifa–Nazareth road, instanceOf, intercity road]
  • A. highway chosen
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • B. Interstate Highway
    An Interstate Highway is a high-capacity, limited-access roadway that forms part of a nationwide network designed to support efficient long-distance and high-speed vehicular travel between major cities and regions.
  • C. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • D. E-road
    An E-road is a major international road within the trans-European E-road network, designated by an "E" followed by a number, that facilitates cross-border road transport across multiple European countries.
  • E. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0319e8e7c8190b37288c8845b9dbc completed April 28, 2026, 4:03 a.m.
Created at: April 28, 2026, 6:41 a.m.