Triple

T28828517
Position Surface form Disambiguated ID Type / Status
Subject Fast User Switching (in development) E727978 entity
Predicate instanceOf P0 FINISHED
Object planned software feature C29305 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned software feature
Context triple: [Fast User Switching (in development), instanceOf, planned software feature]
  • A. feature update
    A feature update is a modification or enhancement to an existing product or system that adds new capabilities, improves performance, or refines current functionality.
  • B. feature chosen
    A feature is a distinct, measurable property or characteristic of a system, product, or dataset that contributes to its functionality, behavior, or descriptive representation.
  • C. planned development
    A planned development is a real estate project in which land use, building placement, density, and amenities are comprehensively designed and approved as a unified, coordinated plan rather than as individual, piecemeal developments.
  • D. visionary proposal
    A visionary proposal is a forward-looking, imaginative plan that outlines bold, innovative ideas for a future state or solution, often extending beyond current constraints or conventional thinking.
  • E. plan
    A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0319dc6088190bbfaa206d40ed74a completed April 28, 2026, 4:03 a.m.
Created at: April 28, 2026, 6:36 a.m.