Triple
T28828517
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fast User Switching (in development) |
E727978
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned software feature |
C29305
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned software feature Context triple: [Fast User Switching (in development), instanceOf, planned software feature]
-
A.
feature update
A feature update is a modification or enhancement to an existing product or system that adds new capabilities, improves performance, or refines current functionality.
-
B.
feature
chosen
A feature is a distinct, measurable property or characteristic of a system, product, or dataset that contributes to its functionality, behavior, or descriptive representation.
-
C.
planned development
A planned development is a real estate project in which land use, building placement, density, and amenities are comprehensively designed and approved as a unified, coordinated plan rather than as individual, piecemeal developments.
-
D.
visionary proposal
A visionary proposal is a forward-looking, imaginative plan that outlines bold, innovative ideas for a future state or solution, often extending beyond current constraints or conventional thinking.
-
E.
plan
A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0319dc6088190bbfaa206d40ed74a |
completed | April 28, 2026, 4:03 a.m. |
Created at: April 28, 2026, 6:36 a.m.