Triple
T28828475
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Whistler Beta 1 |
E727977
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Windows beta release |
C26543
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Windows beta release Context triple: [Whistler Beta 1, instanceOf, Windows beta release]
-
A.
beta testing program
A beta testing program is a structured initiative where a pre-release version of a product is distributed to a limited group of external users to identify bugs, gather feedback, and validate performance before full public launch.
-
B.
software release
chosen
A software release is a specific, packaged version of a software product that is formally delivered to users, typically including new features, fixes, and documentation.
-
C.
Android developer preview
An Android developer preview is an early, pre-release version of the Android operating system provided to developers for testing, feedback, and app compatibility updates before the official public release.
-
D.
Microsoft Windows development codename
A Microsoft Windows development codename is a temporary, often thematic internal name used by Microsoft to identify and reference a specific in-development version or release of the Windows operating system before its official product name is announced.
-
E.
unreleased operating system project
An unreleased operating system project is a not-yet-public software platform under development that manages hardware resources and provides core services for running applications.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0319dc6088190bbfaa206d40ed74a |
completed | April 28, 2026, 4:03 a.m. |
Created at: April 28, 2026, 6:36 a.m.