Triple

T28820093
Position Surface form Disambiguated ID Type / Status
Subject Kyrylo Rozumovsky E727737 entity
Predicate endTimeStatementFor P140 FINISHED
Object Hetman of the Zaporizhian Host NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Hetman of the Zaporizhian Host | Statement: [Kyrylo Rozumovsky, endTimeStatementFor, Hetman of the Zaporizhian Host]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: endTimeStatementFor
Context triple: [Kyrylo Rozumovsky, endTimeStatementFor, Hetman of the Zaporizhian Host]
  • A. statusEndsWhen
    Indicates that a particular status or condition ceases to hold when a specified event, time, or state occurs.
  • B. endAt
    Indicates that an event, process, or state concludes or terminates at a specified time, location, or condition.
  • C. endOf
    Indicates that one entity marks the terminating point or final boundary of another entity, event, or interval.
  • D. endTimeAsCapital
    Indicates that a specified time marks the ending point of an event, process, or state in the role of its designated capital or primary endpoint.
  • E. endDate chosen
    Indicates the point in time at which an event, state, or relationship stops being valid or comes to a conclusion.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0319d09088190bbf14cdf1987792a completed April 28, 2026, 4:03 a.m.
NER Named-entity recognition batch_69f7be53890081909b1d93f30a8f31c6 completed May 3, 2026, 9:29 p.m.
PD Predicate disambiguation batch_69f7bccacbac8190978976324c67db28 completed May 3, 2026, 9:23 p.m.
Created at: April 28, 2026, 6:34 a.m.