Triple
T28812153
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Los Pelambres Expansion Project |
E727541
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | mining expansion project |
C50346
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: mining expansion project Context triple: [Los Pelambres Expansion Project, instanceOf, mining expansion project]
-
A.
mining project
chosen
A mining project is a coordinated set of activities and resources planned and executed to explore, develop, extract, process, and rehabilitate mineral resources at a specific site over a defined lifecycle.
-
B.
mining ministry
The mining ministry is a governmental body responsible for regulating, overseeing, and promoting the exploration, extraction, and management of mineral and mining resources within a country.
-
C.
mining industry
The mining industry encompasses the exploration, extraction, processing, and sale of minerals and other geological materials from the earth to supply raw inputs for manufacturing, energy production, and infrastructure.
-
D.
mining center
A mining center is a centralized facility where mineral extraction operations are coordinated, processed, and managed, often integrating equipment, workforce, and logistics for efficient resource production.
-
E.
mining syndicate
A mining syndicate is a coalition of individuals or organizations that pool resources, capital, and expertise to explore, extract, and profit from mineral or resource deposits, often sharing risks and coordinating operations under a unified agreement.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f0319c38948190bca746ad60fd25ba |
completed | April 28, 2026, 4:03 a.m. |
Created at: April 28, 2026, 6:31 a.m.