Triple

T28807708
Position Surface form Disambiguated ID Type / Status
Subject Trendline E727424 entity
Predicate instanceOf P0 FINISHED
Object equipment package C49652 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: equipment package
Context triple: [Trendline, instanceOf, equipment package]
  • A. hardware and software bundle
    A hardware and software bundle is a packaged offering that combines physical computing devices with pre-installed or accompanying software designed to work together as an integrated solution.
  • B. computer kit
    A computer kit is a collection of modular hardware and software components designed to be assembled, configured, and sometimes programmed by the user to create a functional computer system.
  • C. software package
    A software package is a bundled collection of programs, libraries, configuration files, and metadata distributed together to provide specific functionality that can be easily installed, updated, and managed.
  • D. vehicle upgrade package chosen
    A vehicle upgrade package is a bundled set of optional enhancements—such as performance, comfort, technology, or aesthetic features—added to a base vehicle model to improve its capabilities or appeal.
  • E. homologation option package
    A homologation option package is a set of special features or modifications added to a production vehicle so it meets the technical requirements for participation in a specific motorsport category.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0319c38948190bca746ad60fd25ba completed April 28, 2026, 4:03 a.m.
Created at: April 28, 2026, 6:29 a.m.