Triple

T28804906
Position Surface form Disambiguated ID Type / Status
Subject Atago Green Hills Mori Tower E727345 entity
Predicate instanceOf P0 FINISHED
Object Mori Building C54961 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Mori Building
Context triple: [Atago Green Hills Mori Tower, instanceOf, Mori Building]
  • A. Yoshimoto Kogyo facility
    A Yoshimoto Kogyo facility is a venue or complex owned or operated by the Japanese entertainment company Yoshimoto Kogyo, used for producing, rehearsing, and hosting performances, events, and related entertainment activities.
  • B. Tōkaidō post station
    A Tōkaidō post station was an officially designated rest and relay point along Japan’s historic Tōkaidō road, providing lodging, services, and logistical support for travelers, officials, and goods between Edo and Kyoto.
  • C. 미완공 건물
    미완공 건물은 설계와 골조 등 일부 공사가 진행되었으나 사용 가능 단계까지 모든 건축 공정이 완료되지 않은 상태의 건축물을 의미한다.
  • D. Yokohama Municipal Subway station
    A Yokohama Municipal Subway station is a public transit facility within Yokohama’s subway network where passengers access, board, and transfer between municipal subway trains and related services.
  • E. Tobu Railway station
    A Tobu Railway station is a passenger rail facility operated by the private Japanese company Tobu Railway, serving as a stop for its regional and commuter train services.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0319c38948190bca746ad60fd25ba completed April 28, 2026, 4:03 a.m.
Created at: April 28, 2026, 6:28 a.m.