Triple

T28795027
Position Surface form Disambiguated ID Type / Status
Subject North–South high-speed railway (proposed) E727061 entity
Predicate impactExpected P32908 FINISHED
Object shorter Hanoi–Ho Chi Minh City travel time compared to conventional rail LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: shorter Hanoi–Ho Chi Minh City travel time compared to conventional rail | Statement: [North–South high-speed railway (proposed), impactExpected, shorter Hanoi–Ho Chi Minh City travel time compared to conventional rail]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: impactExpected
Context triple: [North–South high-speed railway (proposed), impactExpected, shorter Hanoi–Ho Chi Minh City travel time compared to conventional rail]
  • A. impactStatus
    Indicates the current state or condition of how something has affected or influenced a target.
  • B. impactOutcome
    Indicates that one entity produces an effect or influence that changes the result, consequence, or final state of another entity or situation.
  • C. impactDescription
    Indicates a description of the effect, consequence, or influence that one entity, action, or event has on another.
  • D. impactBuilding
    Indicates that one entity physically collides with or strikes a building, causing an impact event.
  • E. impactIfCompleted chosen
    Indicates the effect or consequence that will occur if the referenced task or action is fully completed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0319b7c44819085736bcc256185e6 completed April 28, 2026, 4:03 a.m.
NER Named-entity recognition batch_69f6c49627908190b3553474c7c3072b completed May 3, 2026, 3:44 a.m.
PD Predicate disambiguation batch_69f6c3f23ae081909a52801266063a3c completed May 3, 2026, 3:41 a.m.
Created at: April 28, 2026, 6:25 a.m.