Triple

T2877181
Position Surface form Disambiguated ID Type / Status
Subject Bargi Dam E56904 entity
Predicate operator P179 FINISHED
Object Narmada Valley Development Authority
The Narmada Valley Development Authority is a government agency in India responsible for planning, executing, and managing major water resource and multipurpose river valley projects in the Narmada River basin.
E307211 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Narmada Valley Development Authority | Statement: [Bargi Dam, operator, Narmada Valley Development Authority]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Narmada Valley Development Authority
Context triple: [Bargi Dam, operator, Narmada Valley Development Authority]
  • A. Narmada Control Authority
    The Narmada Control Authority is a statutory body in India responsible for coordinating and regulating the planning, construction, and operation of inter-state projects on the Narmada River, including major dams and related infrastructure.
  • B. Narmada Hydroelectric Development Corporation
    Narmada Hydroelectric Development Corporation is a power generation company responsible for developing and operating major hydroelectric projects on the Narmada River in India.
  • C. National Ganga Council
    The National Ganga Council is a high-level Indian government body chaired by the Prime Minister that oversees policy, planning, and coordination for the conservation and rejuvenation of the Ganga River and its basin.
  • D. Tamil Nadu Water Resources Department
    The Tamil Nadu Water Resources Department is the state government agency responsible for managing, developing, and regulating water resources, including irrigation and flood control, across Tamil Nadu.
  • E. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Narmada Valley Development Authority
Triple: [Bargi Dam, operator, Narmada Valley Development Authority]
Generated description
The Narmada Valley Development Authority is a government agency in India responsible for planning, executing, and managing major water resource and multipurpose river valley projects in the Narmada River basin.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Narmada Valley Development Authority
Target entity description: The Narmada Valley Development Authority is a government agency in India responsible for planning, executing, and managing major water resource and multipurpose river valley projects in the Narmada River basin.
  • A. Narmada Control Authority
    The Narmada Control Authority is a statutory body in India responsible for coordinating and regulating the planning, construction, and operation of inter-state projects on the Narmada River, including major dams and related infrastructure.
  • B. Narmada Hydroelectric Development Corporation
    Narmada Hydroelectric Development Corporation is a power generation company responsible for developing and operating major hydroelectric projects on the Narmada River in India.
  • C. National Ganga Council
    The National Ganga Council is a high-level Indian government body chaired by the Prime Minister that oversees policy, planning, and coordination for the conservation and rejuvenation of the Ganga River and its basin.
  • D. Tamil Nadu Water Resources Department
    The Tamil Nadu Water Resources Department is the state government agency responsible for managing, developing, and regulating water resources, including irrigation and flood control, across Tamil Nadu.
  • E. Indravati Hydroelectric Project
    Indravati Hydroelectric Project is a major hydroelectric power station in India that harnesses the waters of the Indravati River to generate electricity and support regional development.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4a4ced288190ab6d3e062d10f7f6 completed March 6, 2026, 9:42 p.m.
NER Named-entity recognition batch_69abe007329c8190b0bc1851c7307124 completed March 7, 2026, 8:21 a.m.
NED1 Entity disambiguation (via context triple) batch_69b03158d0ec8190ba9675ece8f62033 completed March 10, 2026, 2:57 p.m.
NEDg Description generation batch_69b033afe0e08190b6fbf0ec786a71eb completed March 10, 2026, 3:07 p.m.
NED2 Entity disambiguation (via description) batch_69b03437b4d081908c02c01a4dd665b1 completed March 10, 2026, 3:09 p.m.
Created at: March 6, 2026, 10:03 p.m.