Triple

T28717046
Position Surface form Disambiguated ID Type / Status
Subject Mars Ascent Vehicle E729987 entity
Predicate instanceOf P0 FINISHED
Object Mars mission element C55215 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Mars mission element
Context triple: [Mars Ascent Vehicle, instanceOf, Mars mission element]
  • A. Mars system mission
    A Mars system mission is a spaceflight endeavor designed to explore Mars and its surrounding environment, including its moons, atmosphere, surface, and potential for past or present life.
  • B. Mars rover mission
    A Mars rover mission is a space exploration endeavor that lands a robotic vehicle on Mars to traverse the surface, conduct scientific experiments, and transmit data back to Earth.
  • C. Mars mission engineering activity
    Mars mission engineering activity encompasses the planning, design, testing, and integration of systems and technologies required to safely transport, land, and support missions on the Martian surface and in its orbit.
  • D. Mars sample-return mission
    A Mars sample-return mission is a space exploration endeavor designed to collect geological and atmospheric materials from the Martian surface and safely transport them back to Earth for detailed scientific analysis.
  • E. Mars rover instrument
    A Mars rover instrument is a specialized scientific device mounted on a Mars rover that measures, analyzes, or images the Martian environment and geology to support planetary research and exploration objectives.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f043e7d5a4819094b18aca10b1e024 completed April 28, 2026, 5:21 a.m.
Created at: April 28, 2026, 5:51 a.m.