Triple
T28688260
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | R21 freeway |
E729199
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | provincial route |
C22783
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: provincial route Context triple: [R21 freeway, instanceOf, provincial route]
-
A.
radial road
A radial road is a major route that extends outward from a central point, such as a city center, to connect it with surrounding areas.
-
B.
E-road
An E-road is a major international road within the trans-European E-road network, designated by an "E" followed by a number, that facilitates cross-border road transport across multiple European countries.
-
C.
national primary road
A national primary road is a major, government-designated roadway that forms part of a country’s core highway network, carrying high volumes of long-distance and strategic traffic between key cities and regions.
-
D.
departmental road
chosen
A departmental road is a public roadway managed and maintained by a specific administrative department or local authority, typically serving regional or intra-departmental traffic rather than national or major arterial routes.
-
E.
road network
A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f043e60b6c8190ac2cd042e77fe6e9 |
completed | April 28, 2026, 5:21 a.m. |
Created at: April 28, 2026, 5:34 a.m.