Triple
T28645660
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | west–east European inland waterway corridor |
E725047
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | inland waterway corridor |
C6053
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: inland waterway corridor Context triple: [west–east European inland waterway corridor, instanceOf, inland waterway corridor]
-
A.
navigable waterway
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
-
B.
waterway navigation system
A waterway navigation system is an integrated set of tools, sensors, and software that provides real-time guidance, routing, and safety information for vessels traveling on rivers, canals, and other inland or coastal waterways.
-
C.
waterway network
chosen
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
-
D.
inland waterway vessel
An inland waterway vessel is a ship or boat specifically designed and equipped for transporting goods or passengers on rivers, canals, lakes, and other sheltered inland waters.
-
E.
engineered waterway
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f01d8423888190bd2f4e52605bf261 |
completed | April 28, 2026, 2:37 a.m. |
Created at: April 28, 2026, 4:47 a.m.