Triple

T28642582
Position Surface form Disambiguated ID Type / Status
Subject .NET 6 E724967 entity
Predicate instanceOf P0 FINISHED
Object long-term support release C26543 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: long-term support release
Context triple: [.NET 6, instanceOf, long-term support release]
  • A. software release chosen
    A software release is a specific, packaged version of a software product that is formally delivered to users, typically including new features, fixes, and documentation.
  • B. software release model
    A software release model is a conceptual framework that defines how, when, and in what form software versions are planned, built, tested, and delivered to users over time.
  • C. Rocky Linux community resource
    A Rocky Linux community resource is any tool, platform, or material—such as forums, documentation, chat channels, or repositories—created and maintained by the community to support users in installing, configuring, using, and contributing to Rocky Linux.
  • D. support branch
    A support branch is a temporary code line created from a stable base to isolate, develop, and deliver urgent fixes or minor updates without disrupting ongoing mainline or feature development.
  • E. Windows 7 service pack
    A Windows 7 service pack is a cumulative update package that bundles security patches, performance improvements, and feature enhancements to maintain and improve the Windows 7 operating system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01d8423888190bd2f4e52605bf261 completed April 28, 2026, 2:37 a.m.
Created at: April 28, 2026, 4:46 a.m.