Triple
T28640962
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cribstone Bridge |
E724920
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | granite cribwork bridge |
C11245
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: granite cribwork bridge Context triple: [Cribstone Bridge, instanceOf, granite cribwork bridge]
-
A.
granite bridge
chosen
A granite bridge is a durable, load-bearing structure constructed primarily from granite blocks or slabs, designed to span physical obstacles such as rivers, roads, or valleys.
-
B.
cast-iron bridge
A cast-iron bridge is a structure whose primary load-bearing elements are made from cast iron, typically featuring modular, prefabricated components assembled to span a gap such as a river or roadway.
-
C.
wrought-iron bridge
A wrought-iron bridge is a structure for spanning physical obstacles, such as rivers or roads, whose primary load-bearing elements are made from wrought iron, valued historically for its toughness, malleability, and resistance to fatigue.
-
D.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
-
E.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable and stable pathway for transportation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f01d8423888190bd2f4e52605bf261 |
completed | April 28, 2026, 2:37 a.m. |
Created at: April 28, 2026, 4:44 a.m.