Triple
T2861903
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Allied strategic bombers |
E63340
|
entity |
| Predicate | targetedInfrastructure |
P42768
|
FINISHED |
| Object | factories |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: factories | Statement: [Allied strategic bombers, targetedInfrastructure, factories]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: targetedInfrastructure Context triple: [Allied strategic bombers, targetedInfrastructure, factories]
-
A.
enemyTechnologyTargeted
Indicates that a technology belonging to an enemy is being specifically selected or targeted for attack, disruption, or counteraction.
-
B.
significantInfrastructure
Indicates that an entity constitutes an important or critical piece of infrastructure within a system, network, or region.
-
C.
parallelInfrastructure
Indicates that two or more infrastructure elements are arranged or operate in parallel to each other, typically serving similar functions simultaneously.
-
D.
usesInfrastructure
Indicates that one entity makes use of, depends on, or operates through the infrastructure provided or managed by another entity.
-
E.
isPartOfInfrastructure
Indicates that something belongs to, is included within, or functions as a component of a larger infrastructure system.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4c41e8c08190a9e8f5249cc12610 |
completed | March 6, 2026, 9:50 p.m. |
| NER | Named-entity recognition | batch_69abdf8df8288190816767169ea7cbf9 |
completed | March 7, 2026, 8:19 a.m. |
| PD | Predicate disambiguation | batch_69abdd123ec48190af50a1859aea50b7 |
completed | March 7, 2026, 8:08 a.m. |
| PDg | Predicate description generation | batch_69abddedd72c819094a9c4161af07780 |
completed | March 7, 2026, 8:12 a.m. |
Created at: March 6, 2026, 10:02 p.m.