Triple

T28616286
Position Surface form Disambiguated ID Type / Status
Subject WaitForSingleObject E724279 entity
Predicate multiObjectWaitSupport P136126 FINISHED
Object false LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: false | Statement: [WaitForSingleObject, multiObjectWaitSupport, false]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: multiObjectWaitSupport
Context triple: [WaitForSingleObject, multiObjectWaitSupport, false]
  • A. supportsMultipleObjects chosen
    Indicates that the relationship or action can simultaneously involve or apply to more than one object at the same time.
  • B. mayBeHeldConcurrentlyWith
    Indicates that one event, state, or condition is allowed to occur or be in effect at the same time as another without conflict or violation of constraints.
  • C. waitsArePerformedBy
    Indicates that instances of waiting are carried out or executed by a particular agent or entity.
  • D. supportsDistributedObjects
    Indicates that one entity provides the capability to create, manage, or interact with objects whose state and behavior are distributed across multiple networked locations.
  • E. multipleWorkingWith
    Indicates that an entity is simultaneously collaborating or engaged in work with more than one other entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01d816d7c8190a1fe27e3434041dc completed April 28, 2026, 2:37 a.m.
NER Named-entity recognition batch_69f652a492108190b885b955ce147d3c completed May 2, 2026, 7:38 p.m.
PD Predicate disambiguation batch_69f651aad92c8190b874b3b5f9f64434 completed May 2, 2026, 7:34 p.m.
Created at: April 28, 2026, 4:32 a.m.