Triple

T28606132
Position Surface form Disambiguated ID Type / Status
Subject Debian Project Secretary E724055 entity
Predicate instanceOf P0 FINISHED
Object project official C44428 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: project official
Context triple: [Debian Project Secretary, instanceOf, project official]
  • A. project
    A project is a temporary, goal-oriented endeavor composed of coordinated tasks and resources undertaken to create a unique product, service, or result within defined constraints.
  • B. public works project
    A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
  • C. official chosen
    An official is an individual who holds a position of authority or responsibility within an organization or government, empowered to make decisions and perform duties according to established rules and procedures.
  • D. studio project
    A studio project is a creative, often collaborative, hands-on assignment in a studio-based course where students design, develop, and present work that applies theoretical concepts to practical, real-world or experimental problems.
  • E. public official role
    A public official role is a position of authority or responsibility within government or public institutions, empowered to make or influence decisions that affect the public interest.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01d816d7c8190a1fe27e3434041dc completed April 28, 2026, 2:37 a.m.
Created at: April 28, 2026, 4:27 a.m.