Triple

T28597219
Position Surface form Disambiguated ID Type / Status
Subject Mark I SkyTrain cars E723806 entity
Predicate instanceOf P0 FINISHED
Object automated guideway transit vehicle C8949 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: automated guideway transit vehicle
Context triple: [Mark I SkyTrain cars, instanceOf, automated guideway transit vehicle]
  • A. automated guideway transit line
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • B. automated guideway transit station
    An automated guideway transit station is a dedicated facility where driverless, often elevated or grade-separated transit vehicles load and unload passengers using automated control systems for efficient, high-frequency service.
  • C. automated people mover vehicle chosen
    An automated people mover vehicle is a driverless, guided transit vehicle designed to transport passengers along a fixed route within confined areas such as airports, campuses, or urban centers.
  • D. air-cushion vehicle
    An air-cushion vehicle is a craft that travels over land or water supported by a cushion of air formed by downward-directed fans and contained by flexible skirts.
  • E. rapid transit vehicle
    A rapid transit vehicle is a high-capacity, electrically powered rail car or train designed to provide frequent, fast, and reliable urban or suburban passenger transportation on dedicated or grade-separated tracks.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01d80b1908190980594837604b8c7 completed April 28, 2026, 2:37 a.m.
Created at: April 28, 2026, 4:22 a.m.