Triple

T28596706
Position Surface form Disambiguated ID Type / Status
Subject Millennium Line at Commercial–Broadway station E723794 entity
Predicate instanceOf P0 FINISHED
Object SkyTrain station complex C463 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: SkyTrain station complex
Context triple: [Millennium Line at Commercial–Broadway station, instanceOf, SkyTrain station complex]
  • A. BTS Skytrain facility
    A BTS Skytrain facility is an infrastructure element that supports the operation, maintenance, and management of Bangkok’s elevated rapid transit system, including stations, depots, control centers, and related service areas.
  • B. Taipei Metro station
    A Taipei Metro station is a designated facility within the Taipei rapid transit system where passengers access, board, transfer between, and alight from metro trains, typically featuring platforms, ticketing areas, and passenger amenities.
  • C. Via Rail station
    A Via Rail station is a designated facility where Via Rail passenger trains stop to allow travelers to board, disembark, and access related rail services and amenities.
  • D. rapid transit station chosen
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • E. Skyline station
    A Skyline station is an elevated or ground-level transit facility where passengers board, alight, and transfer between Skyline rail services and other transportation modes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01d80b1908190980594837604b8c7 completed April 28, 2026, 2:37 a.m.
Created at: April 28, 2026, 4:22 a.m.