Triple

T28556423
Position Surface form Disambiguated ID Type / Status
Subject Interstate 605 (proposed) in Washington E723018 entity
Predicate constructionOutcome P157751 FINISHED
Object not constructed LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: not constructed | Statement: [Interstate 605 (proposed) in Washington, constructionOutcome, not constructed]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: constructionOutcome
Context triple: [Interstate 605 (proposed) in Washington, constructionOutcome, not constructed]
  • A. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • B. constructionCompletedUnder
    Indicates that the completion of a construction project occurred under the responsibility, authority, or supervision of a specified agent, organization, or governing body.
  • C. constructionState chosen
    Indicates the current phase or status of progress in a construction or building process.
  • D. constructionQuality
    Indicates the degree or standard of workmanship and materials used in creating or assembling something.
  • E. constructionProgram
    Indicates that an entity is involved in or associated with a program or plan for constructing, building, or developing something.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01a60204481909af1bb76247b8221 completed April 28, 2026, 2:24 a.m.
NER Named-entity recognition batch_69f6db1f3ec48190a82e7d893d3c76ba completed May 3, 2026, 5:20 a.m.
PD Predicate disambiguation batch_69f6d82adfa481908a5e196d2e18c73f completed May 3, 2026, 5:07 a.m.
Created at: April 28, 2026, 3:46 a.m.