Triple

T28556400
Position Surface form Disambiguated ID Type / Status
Subject Interstate 605 (proposed) in Washington E723018 entity
Predicate instanceOf P0 FINISHED
Object never-built highway C24289 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: never-built highway
Context triple: [Interstate 605 (proposed) in Washington, instanceOf, never-built highway]
  • A. nonexistent highway chosen
    A nonexistent highway is a planned or rumored roadway that appears on maps, documents, or in public discourse but was never actually built or officially opened to traffic.
  • B. toll road project
    A toll road project is a transportation infrastructure initiative that plans, finances, constructs, and operates a roadway funded primarily through user fees collected from vehicles using the road.
  • C. former road bypass
    A former road bypass is a roadway that was originally constructed to divert through-traffic around a town or congested area but has since been decommissioned, reclassified, or repurposed so it no longer functions as the primary bypass route.
  • D. named highway
    A named highway is a designated road or route identified by a specific name or number, used for navigation, transportation, and geographic reference within a roadway network.
  • E. former U.S. Highway alignment
    A former U.S. Highway alignment is a roadway segment that once carried an official U.S. Highway designation but has since been rerouted, decommissioned, or reclassified under a different route or jurisdiction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01a60204481909af1bb76247b8221 completed April 28, 2026, 2:24 a.m.
Created at: April 28, 2026, 3:46 a.m.