Triple

T2855311
Position Surface form Disambiguated ID Type / Status
Subject Plan of Chicago E63185 entity
Predicate instanceOf P0 FINISHED
Object landmark planning blueprint C11786 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: landmark planning blueprint
Context triple: [Plan of Chicago, instanceOf, landmark planning blueprint]
  • A. planning library
    A planning library is a reusable collection of algorithms, data structures, and tools that support the creation, evaluation, and optimization of plans or schedules within software applications.
  • B. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • C. urban landmark
    An urban landmark is a prominent, easily recognizable feature within a city—such as a building, monument, or natural formation—that serves as a visual reference point and symbol of the area’s identity.
  • D. city planner
    A city planner is a professional who designs, organizes, and regulates the use of urban space to balance social, economic, environmental, and infrastructural needs for sustainable community development.
  • E. urban design project
    An urban design project is a coordinated planning and design effort that shapes the physical form, public spaces, infrastructure, and land use of a specific urban area to improve its functionality, aesthetics, and livability.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ab4c407c408190857d25e027155ce9 completed March 6, 2026, 9:50 p.m.
Created at: March 6, 2026, 10:02 p.m.