Triple

T28519092
Position Surface form Disambiguated ID Type / Status
Subject The Beam of the Bear and the Turtle E721707 entity
Predicate instanceOf P0 FINISHED
Object Beam C54199 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Beam
Context triple: [The Beam of the Bear and the Turtle, instanceOf, Beam]
  • A. beam bridge
    A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
  • B. Hump
    A hump is a raised, rounded protrusion or swelling on a surface, structure, or organism, often forming a distinct bulge or elevation.
  • C. cantilever bridge
    A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
  • D. suspension bridge
    A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
  • E. 교량
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01a5cbcc4819083fb4e723378713e completed April 28, 2026, 2:24 a.m.
Created at: April 28, 2026, 3:19 a.m.