Triple

T28507317
Position Surface form Disambiguated ID Type / Status
Subject openSUSE Build Service E721393 entity
Predicate instanceOf P0 FINISHED
Object free software infrastructure C54171 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: free software infrastructure
Context triple: [openSUSE Build Service, instanceOf, free software infrastructure]
  • A. Free software
    Free software is software that grants users the freedom to run, study, modify, and share it, typically under licenses that protect these rights.
  • B. free software project
    A free software project is a collaboratively developed software initiative whose source code is openly available and may be used, modified, and redistributed under a license that guarantees these freedoms.
  • C. free software community
    A free software community is a collaborative group of users and developers who create, share, and improve software whose source code is openly available and can be freely used, modified, and redistributed.
  • D. free software product
    A free software product is a software application distributed at no monetary cost that grants users the freedom to run, study, modify, and share the program and its source code.
  • E. free software advocate
    A free software advocate is someone who actively promotes the use, development, and protection of software that grants users the freedoms to run, study, modify, and share it.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01a5c072081908c7b04bcf6478da9 completed April 28, 2026, 2:24 a.m.
Created at: April 28, 2026, 3:10 a.m.