Triple

T28506873
Position Surface form Disambiguated ID Type / Status
Subject security.debian.org E721384 entity
Predicate instanceOf P0 FINISHED
Object Debian infrastructure host C54167 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Debian infrastructure host
Context triple: [security.debian.org, instanceOf, Debian infrastructure host]
  • A. Arch Linux infrastructure component
    An Arch Linux infrastructure component is a modular system element—such as a build server, mirror, package repository, or automation service—that collectively supports the distribution, maintenance, and delivery of Arch Linux packages and services.
  • B. Debian Project document
    A Debian Project document is an official or semi-official written artifact produced within the Debian community that records policies, procedures, decisions, or technical information relevant to the development, governance, or use of the Debian operating system.
  • C. R infrastructure component
    An R infrastructure component is a foundational element—such as runtime, package system, or tooling—that supports the execution, management, and scalability of R-based data analysis and applications.
  • D. studio host
    A studio host is a person who leads and facilitates live or recorded productions from a studio setting, guiding conversations, introducing segments, and engaging with guests or audiences.
  • E. Illumos distribution
    An Illumos distribution is an operating system built on the Illumos kernel and userland, typically providing a complete, open-source, Solaris-derived UNIX environment with its own packaging, tools, and system management utilities.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01a5c072081908c7b04bcf6478da9 completed April 28, 2026, 2:24 a.m.
Created at: April 28, 2026, 3:09 a.m.