Triple

T28499026
Position Surface form Disambiguated ID Type / Status
Subject Monorail Line E721184 entity
Predicate instanceOf P0 FINISHED
Object railway service classification C42503 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway service classification
Context triple: [Monorail Line, instanceOf, railway service classification]
  • A. railway classification system chosen
    A railway classification system is a structured framework used to categorize railways, trains, or rail services based on characteristics such as function, capacity, speed, infrastructure, or ownership.
  • B. railway station classification
    Railway station classification is the conceptual categorization of railway stations based on attributes such as size, passenger volume, services offered, and operational importance within a rail network.
  • C. public railway
    A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
  • D. passenger rail service
    Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
  • E. operational railway route grouping
    An operational railway route grouping is a structured collection of railway routes combined for coordinated planning, management, and control of train operations across a defined network segment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01a5afdac8190ac6e72d5c100bd58 completed April 28, 2026, 2:24 a.m.
Created at: April 28, 2026, 3:05 a.m.