Triple
T28498809
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tokyo Metropolitan Routes |
E721178
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | prefectural road system |
C3524
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: prefectural road system Context triple: [Tokyo Metropolitan Routes, instanceOf, prefectural road system]
-
A.
road network
A road network is an interconnected system of roads, intersections, and related infrastructure that enables the movement of vehicles and pedestrians between different locations.
-
B.
highway system
A highway system is an interconnected network of major roads and supporting infrastructure designed to enable efficient, high-capacity vehicular travel between cities and regions.
-
C.
state highway system
chosen
A state highway system is a network of roads and highways maintained and regulated by a state government to facilitate regional transportation and connectivity.
-
D.
road infrastructure
Road infrastructure encompasses the physical structures, systems, and facilities—such as roads, bridges, tunnels, signage, and drainage—designed and built to support safe and efficient vehicular and pedestrian transportation.
-
E.
Farm to Market Road
A Farm to Market Road is a rural roadway designed to connect agricultural areas and farms with nearby towns, markets, and major transportation routes to facilitate the movement of goods and people.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f01a5afdac8190ac6e72d5c100bd58 |
completed | April 28, 2026, 2:24 a.m. |
Created at: April 28, 2026, 3:05 a.m.