Triple

T28494386
Position Surface form Disambiguated ID Type / Status
Subject Tellico Dam project E721066 entity
Predicate instanceOf P0 FINISHED
Object Tennessee Valley Authority project C14342 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Tennessee Valley Authority project
Context triple: [Tellico Dam project, instanceOf, Tennessee Valley Authority project]
  • A. Tennessee Valley Authority facility chosen
    A Tennessee Valley Authority facility is any physical installation, plant, dam, office, or infrastructure site owned, operated, or managed by the Tennessee Valley Authority for power generation, environmental stewardship, or regional development.
  • B. New York City water tunnel
    A New York City water tunnel is a large underground aqueduct system that transports potable water from upstate reservoirs to the city’s distribution network.
  • C. New Deal town
    A New Deal town is a planned community developed or significantly shaped by U.S. federal New Deal programs in the 1930s–1940s to provide employment, housing, and modern infrastructure while experimenting with social and economic reform.
  • D. Panama Canal infrastructure
    Panama Canal infrastructure encompasses the system of locks, channels, dams, ports, support facilities, and control technologies that enable the transit, management, and maintenance of maritime traffic through the Panama Canal.
  • E. New Deal art project
    A New Deal art project is a government-funded initiative from the 1930s that employed artists to create public artworks—such as murals, sculptures, and posters—as part of broader economic relief and cultural enrichment efforts.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01a5afdac8190ac6e72d5c100bd58 completed April 28, 2026, 2:24 a.m.
Created at: April 28, 2026, 3:03 a.m.