Triple

T28489629
Position Surface form Disambiguated ID Type / Status
Subject Chinese Train Control System E720925 entity
Predicate CTCS-4 P18634 FINISHED
Object designed for moving block operation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: designed for moving block operation | Statement: [Chinese Train Control System, CTCS-4, designed for moving block operation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: CTCS-4
Context triple: [Chinese Train Control System, CTCS-4, designed for moving block operation]
  • A. hasAutomaticTrainControlCompatibility
    Indicates that an entity is compatible with, or supports integration with, an automatic train control (ATC) system.
  • B. hasAutomaticTrainControl
    Indicates that an entity is equipped with or uses an automatic train control system for managing train operations.
  • C. railSystemType chosen
    Indicates the specific category or classification of a rail transportation system that an entity belongs to or operates within.
  • D. railcodeSystem
    Indicates a relationship where a rail-specific code is assigned to, used by, or governs a particular system within a railway context.
  • E. isElectricRailway
    Indicates that a given railway system operates using electric power rather than diesel or other forms of propulsion.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f01a5a47148190b0a7e111bc432e0a completed April 28, 2026, 2:24 a.m.
NER Named-entity recognition batch_69f65f7731e4819099d5bd3d915ee266 completed May 2, 2026, 8:32 p.m.
PD Predicate disambiguation batch_69f65c2198208190a3954086c22cfcbf completed May 2, 2026, 8:18 p.m.
Created at: April 28, 2026, 3 a.m.