Triple
T28457509
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Olomouc tram network |
E716752
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | electric rail transport system |
C12520
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: electric rail transport system Context triple: [Olomouc tram network, instanceOf, electric rail transport system]
-
A.
electric transport system
An electric transport system is an integrated network of vehicles, infrastructure, and control technologies that enables the movement of people or goods using electricity as the primary energy source.
-
B.
electrified railway
chosen
An electrified railway is a rail transport system in which trains receive power from external electrical sources, such as overhead lines or third rails, instead of relying on onboard fuel.
-
C.
rapid rail system
A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
-
D.
third rail electrification system
A third rail electrification system is a method of providing electric power to trains via an additional rail mounted alongside or between the running rails, from which current is collected by contact shoes on the train.
-
E.
rail transit
Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efd6b76f8c8190a7ba908aca280942 |
completed | April 27, 2026, 9:35 p.m. |
Created at: April 28, 2026, 1:55 a.m.