Triple

T28453891
Position Surface form Disambiguated ID Type / Status
Subject The Tunnel to Nowhere E716654 entity
Predicate instanceOf P0 FINISHED
Object subway infrastructure segment C21697 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: subway infrastructure segment
Context triple: [The Tunnel to Nowhere, instanceOf, subway infrastructure segment]
  • A. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • B. underground rail corridor chosen
    An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
  • C. subway station area
    The subway station area is the spatial zone encompassing the station entrances, platforms, circulation paths, and adjacent public spaces where passengers access, wait for, and transfer between subway services.
  • D. commuter rail infrastructure
    Commuter rail infrastructure comprises the physical and operational systems—such as tracks, stations, signaling, power, and maintenance facilities—designed to support frequent, reliable passenger train service between suburbs and urban centers.
  • E. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efd6b76f8c8190a7ba908aca280942 completed April 27, 2026, 9:35 p.m.
Created at: April 28, 2026, 1:53 a.m.