Triple

T28452182
Position Surface form Disambiguated ID Type / Status
Subject Nationally Significant Infrastructure Projects E716605 entity
Predicate hasProcessStage P93124 FINISHED
Object pre-application LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: pre-application | Statement: [Nationally Significant Infrastructure Projects, hasProcessStage, pre-application]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasProcessStage
Context triple: [Nationally Significant Infrastructure Projects, hasProcessStage, pre-application]
  • A. hasStageIn
    Indicates a relationship where one entity occurs, exists, or takes place within a particular stage or phase of another process, lifecycle, or sequence.
  • B. hasProceduralStage chosen
    Indicates that an entity is associated with, or progresses through, a specific step or phase within a broader procedure or process.
  • C. hasProcess
    Indicates that an entity is associated with, participates in, or is characterized by a particular process.
  • D. hasStageStart
    Indicates that a process, event, or workflow begins or enters a particular stage at a specified point or condition.
  • E. hasStageType
    Indicates that an entity is associated with, or classified by, a specific type or category of stage within a process, lifecycle, or workflow.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69efd6b76f8c8190a7ba908aca280942 completed April 27, 2026, 9:35 p.m.
NER Named-entity recognition batch_69fed48d8e148190a99c0aea29f8a3ee completed May 9, 2026, 6:30 a.m.
PD Predicate disambiguation batch_69fed3c82a24819095e614e31ac0307f completed May 9, 2026, 6:27 a.m.
Created at: April 28, 2026, 1:52 a.m.