Triple
T28452087
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Community Infrastructure Levy |
E716604
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planning charge |
C54082
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planning charge Context triple: [Community Infrastructure Levy, instanceOf, planning charge]
-
A.
plan
A plan is a structured set of intended actions and decisions, organized over time and resources, to achieve specific goals or outcomes.
-
B.
schedule provision
A schedule provision is a defined rule or clause that specifies the timing, frequency, and conditions under which tasks, services, or obligations must be performed or delivered.
-
C.
charging system
A charging system is an integrated arrangement of hardware and control components that manages the transfer of electrical energy from a power source to one or more devices, ensuring safe, efficient, and reliable charging.
-
D.
planning library
A planning library is a reusable collection of algorithms, data structures, and tools that support the creation, evaluation, and optimization of plans or schedules within software applications.
-
E.
long-term plan
A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efd6b76f8c8190a7ba908aca280942 |
completed | April 27, 2026, 9:35 p.m. |
Created at: April 28, 2026, 1:52 a.m.