Triple
T28433052
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Provo River Project |
E715189
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Bureau of Reclamation project |
C46999
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Bureau of Reclamation project Context triple: [Provo River Project, instanceOf, Bureau of Reclamation project]
-
A.
reclamation project
chosen
A reclamation project is an organized effort to restore, rehabilitate, or repurpose disturbed or degraded land, water, or resources for productive or environmentally sustainable use.
-
B.
water resources development act
The Water Resources Development Act is a recurring United States federal law that authorizes and guides the planning, construction, and maintenance of water resources projects such as navigation, flood control, and ecosystem restoration, primarily carried out by the U.S. Army Corps of Engineers.
-
C.
U.S. Army Corps of Engineers district
A U.S. Army Corps of Engineers district is a regional organizational unit responsible for planning, designing, constructing, and managing civil works and military projects within a defined geographic area.
-
D.
proposed dam project
A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
-
E.
water transfer project
A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69efd6b253888190b3c7222ed6a403a8 |
completed | April 27, 2026, 9:35 p.m. |
Created at: April 28, 2026, 1:41 a.m.