Triple
T28406545
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | INT 10h video services |
E719543
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | BIOS interrupt |
C23685
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: BIOS interrupt Context triple: [INT 10h video services, instanceOf, BIOS interrupt]
-
A.
IBM PC compatible BIOS
chosen
An IBM PC compatible BIOS is the low-level firmware interface that initializes hardware and provides standard boot and runtime services so operating systems and software can run on IBM PC–compatible computers.
-
B.
DOS memory management interface
A DOS memory management interface is a software layer that provides functions and tools for allocating, freeing, and organizing conventional, upper, and extended memory within the constraints of DOS’s segmented memory architecture.
-
C.
boot sector
A boot sector is a dedicated region on a storage device that contains machine code and data used by a computer’s firmware to initiate the operating system’s startup process.
-
D.
reboot
Reboot is the process of shutting down and restarting a system or device to reinitialize its hardware and software components and restore normal operation.
-
E.
Intel event
An Intel event is a scheduled gathering or presentation where Intel showcases its latest technologies, products, innovations, and strategic initiatives to developers, partners, media, and customers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6f0f37c8190b37bc6fab08a9449 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:23 a.m.