Triple

T28400497
Position Surface form Disambiguated ID Type / Status
Subject Global Producing Centres for Long-Range Forecasts E719382 entity
Predicate instanceOf P0 FINISHED
Object climate prediction service system C23665 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: climate prediction service system
Context triple: [Global Producing Centres for Long-Range Forecasts, instanceOf, climate prediction service system]
  • A. climate forecast product
    A climate forecast product is an information package that provides scientifically derived predictions of future climate conditions (such as temperature, precipitation, or extreme events) over specified regions and time horizons to support planning and decision-making.
  • B. climate services framework chosen
    A climate services framework is a structured approach that connects climate data, tools, and expertise with user needs to support informed decision-making and climate-resilient planning across sectors.
  • C. numerical weather prediction model
    A numerical weather prediction model is a computational system that uses mathematical equations and atmospheric data to simulate and forecast future weather conditions.
  • D. climate model
    A climate model is a computational representation of the Earth’s climate system that simulates interactions among the atmosphere, oceans, land surface, and ice to project past, present, and future climate conditions.
  • E. meteorological decision-support tool
    A meteorological decision-support tool is a system that integrates weather data, forecasts, and analytical models to help users make informed operational and strategic decisions based on atmospheric conditions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6efd1b08190ae3cefd4f11388a2 completed April 27, 2026, 11:53 p.m.
Created at: April 28, 2026, 1:19 a.m.