Triple
T28393665
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | UK Round 2 offshore wind projects |
E719222
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | renewable energy project portfolio |
C53990
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: renewable energy project portfolio Context triple: [UK Round 2 offshore wind projects, instanceOf, renewable energy project portfolio]
-
A.
renewable energy technology project
A renewable energy technology project is an organized initiative that designs, develops, and implements systems or solutions to generate energy from naturally replenishing sources such as solar, wind, hydro, or geothermal power.
-
B.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
-
C.
renewable energy developer
A renewable energy developer is an entity or professional that identifies, plans, finances, and constructs projects that generate power from sustainable sources such as solar, wind, hydro, or geothermal energy.
-
D.
architectural project portfolio
An architectural project portfolio is a curated collection of an architect’s or firm’s design works, showcasing project concepts, processes, visuals, and outcomes to demonstrate skills, style, and professional capabilities.
-
E.
community energy project
A community energy project is a locally initiated and collectively governed initiative that develops, owns, or manages energy generation, efficiency, or storage systems to meet shared social, environmental, and economic goals.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eff6efd1b08190ae3cefd4f11388a2 |
completed | April 27, 2026, 11:53 p.m. |
Created at: April 28, 2026, 1:15 a.m.